This is the latest draft of the track plan for the MCTD. As always, I consider this plan a work-in-progress, and not all elements are shown. In particular, benchwork sections may not appear in the plan.
Current Version – V1.5.4
Changes from last version
Minor revision.
Added a crossover near Crown Cork & Seal to allow trains to cross back and forth. Previously trains on the Chessie side that want to Consolidated Coal couldn’t get back out to the Chessie mainline.
Previous Versions
I often say a track plan is never finished, it’s just the latest draft. In fact you can search for it above and find at leat two or three instances! Here’s some past versions of the plan, in case you’re interested in the evolution.
Version
Thumbnail (Click to Enlarge)
Changes from Previous Version
Version 1.5.3
Added Cambridge Iron & Metal back into plan, in a more prototypical location than the spur removed in Version 1.5.2
Added passing siding near the GM Siding area
Shifted Conrail trackage to support better spacing due to passing siding addition at GM Siding
Version 1.5.2 br>
(Major Revision)
Relocated spray booth location to just "east" (to the right) of Eastern Ave area
Removed "run through" Halethorpe/Wicomico St. Peninsula connected to right side
Interim Plan attempting to fit Halethorpe industries back into plan in former B&O yard location without major modifications to former Halethorpe layout.